During the 57 day period starting November 19, 2024, 2 accessibility tests of progress.net have been done. Progress.net was functional 2 times from the aggregate tests performed, last operable January 13, 2025, and replying with 200 status code. As of January 15, 2025, no instances of progress.net being down had occurred during the inspections that were conducted. All the replies received indicate that there have been no responses with an error status as of January 15, 2025. Compared to the 0.457 seconds average, progress.net's response time on January 13, 2025, was 0.405 seconds.